Problem-led Zoomlion packages — pick the worksite challenge, then lock the crane, excavator, concrete or drilling mix that keeps your schedule intact.
A six-step roadmap from first site call to fleet handoff — structure borrowed from our engineering playbook, content rewritten for application solutions.
Capture duty cycle: dig depth, lifting capacity, pump output or pile penetration depth.
Map constraints: ground pressure, tip radius, emissions tier, night-noise limits.
Select machine class across crane, excavator, concrete and drilling families.
Attach wear/parts plan: undercarriage, S-valve kits, wire rope and bit kits.
Issue documentation: load charts, CE/EPA dossiers, ISO certificates.
Commission on site with FSE support and a 30-day follow-up check.
We coordinate with EPC planners, rental fleets and regional parts hubs — roles, not logos of unauthorized brands.
Mining: When primary crusher starvation delays the plant, we pair a mid-to-large excavator with a rotary drilling rig for face advance and stage undercarriage rebuild kits at the hub so track shoe width changes do not wait on ocean freight.
Road: When mat temperature windows shrink, the package locks paver, MTV and dual rollers with published vibration frequency bands and spare screed plates timed to the paving day count.
Building: When tip-radius loads threaten the pour, tower or crawler crane selection starts from lifting capacity and boom length, then adds concrete pump output capacity so hoist and pour crews share one schedule.
Water: Soft cofferdam pads need lower ground pressure undercarriage and crawler cranes with outrigger mat plans; drilling packages publish rotary drilling torque and pile penetration depth ranges for intake shafts.
Tell us mining, road, building or water conservancy — we return a machine mix and parts plan in two working days.