Talk with a Zoomlion Project Advisor

Warm, practical guidance for crane packages, concrete pumps and excavator fleets — reach hotline, engineering or parts hubs first, then send your quote details below.

Field-service Hotline

24/7 dispatch for contracted sites · target < 18h MTTR on critical cranes and pumps

+1-800-555-9646

Engineering Team

Load charts, boom length studies, hydraulic SOPs · typical reply within 24 hours

[email protected]

Spare Parts Hub

22 regional warehouses · undercarriage, hydraulic kits, concrete pump wear sets

Open parts catalog

Visit & hours

  • Address: Zoomlion Global Project Desk — inquire for nearest regional hub
  • Email: [email protected]
  • Phone: +1-800-555-9646
  • Hours: Mon–Fri 08:00–18:00 local hub time · emergency hotline 24/7
  • Social: LinkedIn · YouTube field demos
Map-style illustration of Zoomlion regional parts hubs on world construction corridors
Regional hubs stage parts within reach of active crane and concrete projects.

What to prepare before you call

Friendly advisors move faster when you already know the duty cycle. For crane packages, list tip-radius loads, boom length targets and whether the lift plan must follow ASME B30 practice. For excavators, note dig depth, bucket capacity (m³) and track shoe width on soft pads. Concrete pump inquiries should include vertical height, desired output capacity (t/h) and aggregate abrasion class so wear-plate kits are sized correctly. Rotary drilling questions need pile penetration depth and rotary drilling torque ranges from the geotech note.

If your site sits more than 100 km from a regional hub, say so — we will flag air-freight lead times for undercarriage and S-valve kits instead of promising Ex-Works stock that is not there. When emissions dossiers are mandatory, ask for EPA Tier 4 Final or EU Stage V serial documentation in the first message so engineering attaches the right binder pages. Night paving or urban demolition crews should also mention noise or dust limits; those constraints change which roller or high-reach excavator we recommend.

We cannot quote binding prices from this form alone. Transportation, customs clearance and on-site commissioning are scoped after the machine class is locked. Soft-ground outrigger mats, temporary power for electric accessories and operator training seats are optional line items — tell us if they belong in the first package or a later change order.

Send your project inquiry

This form sits below the contact cards — not a modal. Include equipment class, country and whether you need Tier 4 Final documentation.